New Construction Week 13
This week we saw a lot of finishing touches to our new school on E. Franklin Street. All of the base board throughout the school has been installed finishing up the clean look of the flooring. Toilets and sinks have been installed in all three classrooms. One sink in each classroom has been lowered down […]
New Construction Week 12
All of our kitchen appliances have been delivered, waiting to be installed. We also have received our shipment of under counter refrigerators, one for each classroom. Every classroom will have it’s own thermostat, insuring everyone’s comfort. The last of the ceiling tiles have been installed and all of the cabinet doors have received their hardware. […]