The exterior fencing is up on our E Franklin Street location. We will have two playgrounds with a gate between them. Both playgrounds are shaded by an enormous old oak tree that is at least 75 years old! The drywall is completed on the interior of the building and the walls have received a coat of primer. The classroom sinks, under sink cabinets and over sink cabinets have arrived are are being installed. The ceiling grids are up and our new LED lighting is installed. Aside for being more energy efficient, the LED lights will last longer and provide a more natural lighting in the rooms. Stay tuned for more updates!